Model: vertical fresh air system xfgj2-300-01 model

The design and installation of the central fresh air system mainly consider the layout of the pipeline. On the one hand, it is necessary to minimize the loss of air volume, on the other hand, it is also necessary to meet the requirements of the ceiling height of the owner, and then it is necessary to cooperate with the central air conditioning pipes of some owners. Therefore, it is suggested that all owners should do a good job in coordinating all aspects when installing the fresh air system.

1、 Main problems to be considered in the construction and installation of central fresh air system:

1. First of all, we need to consider what pipeline to use, and give priority to hard pipeline;

2. The arrangement of pipelines should be considered to minimize the loss of air volume;

3. Meet the requirements of the ceiling height of the overall indoor design of the customer;

4. Whether the structural conditions of the location where the hole needs to be punched through the wall are met or permitted, and cannot be at the expense of destroying the overall structure of the room;

5. Selection and treatment of air outlet position and air conditioner return air outlet position.

2、 The simple installation process of central fresh air system is as follows:

1. Technicians came to the site to measure the site, and suggested to the owner what kind of central fresh air system to install, how many sets to install, where to install the main machine, how to go the air duct, where to leave the air outlet, and where to put the switch.

2. The design scheme and contract are issued by the technician, and the contract is signed with the consent of the owner.

3. After the owner completes the water and electricity transformation, reserve the power supply and connect the switch box to the main machine conduit. Installation personnel enter the site to install the host, air duct, etc., and test equipment.

4. After the wall is painted, the installer will come to the site again to install the air outlet and switch.


label

0
Website of this article:https://en.zj-ma.com/product/713.html
Last:None

Recent browsing:

Related products

Relevant news

400-189-9844

24-hour hotline

customer service

MAKE AIR,Let the earth breathe healthily

Copyright © Zhejiang Everest air purification technology Co., Specializing inFresh air system manufacturer,Fresh air manufacturer,Household fresh air fan,Welcome to inquire! All rights reserved Record No:浙ICP备2021000765号-1
Support:中企视窗